Skip to content

Smart Vision for construction

Tighter site control, from the gate to the danger zones

VIDEO.MA designs Smart Vision installations for construction sites: access and vehicle counting, after-hours intrusion and danger-zone alerts, and progress documentation through periodic snapshots. Each setup is designed around power, connectivity and project duration.

Zone ACounting linevehicle #3vehicle #8vehicle #11CAM 01Count100Occupancy63%
Illustration — fictitious demo data

What it is costing you today

Free audit

How many days of delay come from waiting on deliveries or machinery?

Downtime caused by trucks waiting or idle machinery is rarely measured on site. Tracking activity in access and storage zones helps plan deliveries and rotations better.

How much equipment leaves the site without anyone noticing?

Theft and loss of equipment are often discovered the next day, or later. Alerts on storage zones outside working hours let you react while it is still possible.

How many entries into danger zones go unseen?

A presence in a hazardous area is often only known after an incident. Alerts on defined zones help react in the moment and adapt barriers and signage, without individually monitoring workers.

Construction Sites

Industry challenges

01

Hard-to-quantify access

The number of workers and vehicles entering the site varies widely between phases, with no consolidated tracking.

02

After-hours intrusion and theft

Materials, tools and machinery are exposed at night and weekends on sites that are often open or poorly fenced.

03

Presence in danger zones

Lifting areas, excavations and machinery routes put people at risk when instructions are not followed.

04

Poorly documented progress

Project owners and remote teams lack regular visual evidence to follow the progress of works.

VIDEO.MA

What VIDEO.MA delivers

Access counting

Per project

Aggregated count of people entering and leaving through the main gate, by time slot and by day.

Vehicle and machinery entry/exit

Per project

Counting of trucks, machinery and light vehicles at site gates, with a time-slot history.

After-hours intrusion alerts

Per project

Notification of people or vehicles on site outside working hours, in addition to guarding.

Danger-zone alerts

Per project

Presence detection in a defined zone (lifting radius, excavation, storage) based on configurable rules.

PPE detection (helmet, vest)

Feasibility study

Detection of helmets or high-visibility vests, highly dependent on distance, angle and lighting; must be validated through an on-site study.

Progress documentation

Per project

Scheduled periodic snapshots from fixed viewpoints to build a visual history of the works.

Centralised multi-site monitoring

Coming soon

Self-service consolidated view of several sites and their alerts, planned for the future SaaS platform.

Example metrics

  • People entering per day

    Video data

    Aggregated passages at the main gate, by time slot.

  • Truck rotations

    Video data

    Number of truck and machinery entries and exits per day.

  • Danger-zone alerts

    Video data

    Number and hourly distribution of presence detections in risk zones.

  • After-hours intrusions

    Video data

    Detections of people or vehicles outside working hours.

  • Planned vs. observed deliveries

    Video + business data

    Comparison of deliveries scheduled in the site management tool with measured truck entries.

Dashboard preview

Dashboard · Site — Daily summaryDemo data

People entries

137

Truck rotations

23

Danger-zone alerts

4

Progress snapshots

12

Activity per hour

Events

  • Presence in lifting zone — Crane 1
  • After-hours intrusion — East gate, 02:17
  • Machinery entered — Main access, 07:32
Illustration — fictitious demo data

Deployment approach

  1. 1

    Site audit and feasibility

    Review of the site plan, access points, risk zones, power supply and available 4G/5G coverage.

  2. 2

    Zone and indicator configuration

    Definition of counting lines at gates, danger zones, alert time windows and progress viewpoints.

  3. 3

    Pilot on one gate or zone

    Installation of a first mast or standalone kit, validation of detections under real dust, weather and lighting conditions.

  4. 4

    Rollout and follow-up

    Extension to other zones, adaptation to each project phase, maintenance and dismantling at the end of works.

Prerequisites, limitations and privacy

  • Site installations are temporary: power (mains, generator or solar), 4G/5G connectivity and camera mounting are studied case by case.
  • Dust, rain, wind and changing light can reduce accuracy; maintenance and lens cleaning must be planned.
  • PPE detection remains at study stage: it does not replace safety supervision or the contractor’s regulatory obligations.
  • Alerts complement guarding and intrusion systems; they do not replace them.
  • As data controller, the project owner or contractor completes Law 09-08 formalities with the CNDP and informs workers; VIDEO.MA can provide support.

Frequently asked questions

How do you power cameras on a site with no grid?

Depending on the site, power can come from the temporary connection, a generator or a solar kit with battery. Connectivity is usually provided by a 4G/5G router, with coverage checked during the audit.

Is helmet and vest detection reliable?

It depends heavily on distance, viewing angle, lighting and the clothing worn. That is why it is offered at study stage, with an on-site test before any decision.

Can the system follow the site as it evolves?

Yes. Zones and viewpoints can be reconfigured from phase to phase, and equipment can be moved as the site footprint changes.

What happens to the equipment when works end?

The setup is designed to be dismantled. Terms for return, rental or reuse on another site are defined as part of the project.

Have a project in this industry?

Get a quote tailored to your sites, cameras and metrics.